Facilities & Directions
Siebens Fieldhouse
Siebens Fieldhouse, home to the Athletic Department, was originally dedicated on December 6, 1968. The facility included two handball courts; the 45 x 75-foot, six-lane Finkbine Pool; a training room; two locker rooms; faculty dressing room; equipment storage room; mechanical equipment room; laundry room; pool office and storage room. The main floor featured three classrooms, offices, staff locker room, restrooms, gymnasium and a storage room. The upper balcony had seating for 2,700, storage and folding bleachers, which made room for a multi-purpose area used for weight lifting, gymnastics, dancing and boxing. The cost of the project was $1,160,000.
The facility underwent major renovations in 2001-02. Locker room space was reconfigured to allow for nine individual locker rooms, the hardwood racquetball and gymnasium floors were sanded and re-finished incorporating the new athletic logo and new heating and cooling systems were installed. In addition, the athletic training room was relocated and expanded, two classrooms also being relocated to the lower level.